Get in Touch with TCPEL

Contact Form 使用中
ROI Assessment Tool

Pellet Line Investment & Operating-Cost Estimator

See the indicative line investment and annual electricity cost before you send an RFQ.

Typical single-shift ≈ 2,500 h · double-shift ≈ 5,000 h · near-continuous ≈ 7,000 h
Enter your local industrial tariff
Awaiting Calculation Parameters…

Estimated figures

Annual pellet output
Annual electricity use
Annual electricity cost
Indicative complete-line FOB Qingdao
Please input parameters to generate operational planning notes.
Request a Detailed Quotation →

Estimates use an industry figure of ~90 kWh per ton of finished pellets (typical range 70–110). Electricity is only part of operating cost — drying wet feedstock can add 30–50% on top. FOB ranges are indicative; the exact figure is configuration-dependent.